Check the waterway and circuit before starting the machine. The boot sequence is:
①Turn on the incoming line power and turn on the key switch. At this time, the machine's air extraction and refrigeration system are energized, and the ammeter shows a value of about 7A;
②Wait for 5-10 seconds, press the trigger button on the external control panel, the ammeter will display a value of zero, after 3-5 seconds, the krypton lamp will light up, and the ammeter will display a value of 7A. (Refer to the operation manual of laser power supply);
③Turn on the power of the galvanometer;
④Turn on the computer and call up the required marking file;
⑤Adjust the laser power supply to the working current (10~18A), and then start marking;
After marking, turn off the power of each component in the reverse direction according to the above sequence:
① Adjust the working current of the laser power supply to the minimum (about 7A);
②Turn off the computer;
③Turn off the power supply of the galvanometer;
④Press the stop button;
⑤Turn off the key switch;
⑥Disconnect the incoming power supply.












